« Back to News & Notices

2025 – 2026 Waterline Replacement Project ~ Maryanne, Barrett, and Panorama

Upon the completion of the water system CIP in 2020, the Kingsbury General Improvement District (District) has established a waterline replacement program prioritizing the replacement of undersized and problematic areas of the water distribution system.  While the CIP is referenced for planning efforts, other capital needs may arise and may take priority.  As capital projects are being implemented, the next project will include a District self-funded water replacement project for Maryanne Drive, Barrett Drive, Carol Circle, Drew Court, Panorama Drive, and Vista Drive as the 2025-2026 Waterline Replacement Project (Project). The Project limits Maryanne Drive extending between the intersection of Andria Drive and East Barret Drive with Carol Circle extending off Maryanne Drive.  The Limits of Barrett Drive include the intersection of Barrett and Andria Drive and extend from Andria to Maryanne to the cul-de-sac of Drew Court.  Panorama limits begin at Edgewood and turn to end of Panorama.  Vista includes the length from the turn off Panorama to the start of private driveway.  The streets within the waterline replacement area are not considered for full road replacement due to favorable pavement condition index scores, and roadway improvements will consist of trench patching where mains have been replaced.  The existing roadway will receive trench patching in areas of excavation.  The total Project will include approximatel 8,900-linear feet of waterline replacement with new ductile iron pipe, a PRV vault, fire hydrants, water service line replacements, service meter relocations, and associated asphalt patching.